Flying Brick K75: First phase of paint

Posted: July 10, 2016 by noahyamen

Motor  Throttle  Body  Block 2

After finally degreasing the motor and throttle body I was able to paint the entire block, swing arm, and valve cover.

The valve cover could stand to be replaced, since it has road rash on it. But until I find one in decent shape this one will have to do.

The airbox needed to be replaced since it had a pretty significant crack along the side of it.

Photos

Get A Free Quote!

Simply answer a few simple questions and receive a quote within 24 hours!

Your Details

Your Bike